You are not logged in. Please register or login below
If constructed, the turbines would generate up to 9.2 MW (megawatts) of electricity.
The proposed Alaska Wind Farm site has been carefully selected following a detailed study of Dorset and the South West. The study identified Masters Quarry as a suitable location as it meets the criteria set out in the national planning policy guidelines.