Project details

  • Turbine type: Vestas V80
  • Capacity: 2 megawatt (MW) per wind turbine. Total installed capacity is therefore 8MW
  • Height: 125m to the tip of the blade, measured from original ground level
  • Expected annual power output: circa 17 gigawatthour (GWh). The generated electricity will be fed into the local grid network
  • Life span: the wind farm is expected to be commissioned by the end of 2023 and will remain operational for up to 20 years

Overview in pictures of construction progress to date

All four turbines installed, final blade put in place